This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.

Pachuca

Pachuca
Pachuca in Port Angeles, WA USA

Wednesday, July 22, 2009

Deck Work Finished



Today I reinstalled the traveller. It is the original track with new blocks that will give me more purchase. I got everything started then got help from Anders of Port Townsend Rigging with tightening the nuts. He worked above with a screw driver while I worked below with a wrench. For once I got sealant just right because a thin bead of the material was squeezed out from both sides of the track. Later I fitted new lines.

I also worked with Dan and Lisa on the specification for a new mainsheet. I had found that the sheet was too short to allow me to push the boom almost abeam when running downwind. No wonder. We worked out that I needed 90 feet of sheet and my existing one was only 54 ft long.

Yesterday I installed the rope organizer and the padeyes for anchoring down the running back stays when they are not in use. The organizers are on black plastic-like blocks similar to the "Star Board" on which we bedded the stanchions in Hawaii. I would have preferred white blocks but black they are.

Yesterday I got a call from the sail maker and was asked to visit for a face-to-face on their findings. Lisa loaned me the company pickup truck and soon I was at the sail maker's loft for what turned out to be a one hour visit.

We went through their recommendations on the mainsail step by step and they all made sense. The total cost was just over $3,000. Much of that work would be to bolster the sail up and give it better protection rather than outright repairs. Then we turned our attention to the jib which I had almost not brought in because it was only one year old and seemed OK to me. The recommendations on the jib added up to just over $2,000. A total of over $5,000 was too rich for my blood so we went through the process again identifiying only the essential items. The total was reduced to just over $3,000. They could not complete the work before 17 August which was not acceptable to me so we agreed that I would return the sails on the last day of August.

The sail loft has an extremely good reputation for producing offshore sails that last 60,000 miles. Looking back, they were attempting to send me back out with sails to their high standard. However, I paid $5550 AUD, about $4440 USD for the laminated jib one year ago, a technology that the sail loft does not have. I paid $5709 AUD , about $4567 USD for the mainsail in Aug 2005. It didn't make sense to me to invest more money in the sails than I had paid for either one of them.

Today I put the mainsail back up and had a close look at it as I handled it. It didn't look that bad to me.

Sunday, July 19, 2009





This is Sunday and I am on a break visiting Arnold and Sandra.

Yesterday I sanded the four round winch platforms then painted them with three coats of 2-pack paint. The top photo shows the wooden toppings that I removed. In the second photo you can see the six filled-in holes in the near platform before the painting. The four holes not filled in are for the padeyes used to stow the running backstays. The thired photo shows the four painted platforms.

I also polished the stainless steel bow protection plate.

The lower photo is of a Hunter 31 that caught my eye. The boat seems to have a lot of freeboard and very little keel. I'm sure that the Hunter 31 is a fine boat but I'm wondering how much sail it can carry.

Friday, July 17, 2009

Progress Report



Yesterday was very productive for me. Dan at Port Townsend Rigging sent one of his people to Pachuca to set me up for filling in the 24 holes of the winch platforms in front of the cabin. He brought everything required including a mask for me. He showed me the technique of reaming out the top of the holes with a countersink bit to give better support to the filler material. He then mixed the epoxy and showed me something else that I had not seen before: using a plastic injector for inserting the epoxy from the bottom of the hole up. He then left me to it. I filled in the 24 holes then filled in several other areas, in particular the four screw holes over the head that had been filled with silicone sealant until then. I then mixed another batch of epoxy and made the repairs inside the cabin ceiling which I believe will stop the leaks on the starboard side.

In the afternoon I had a go at tightening the headstay. Jeff Compton had showed me how to do it in Honolulu but I must have not been paying enough attention because I could not get the drum to go up. Dan told me how to do it. He says that one of the good things about Profurl is that you can get to the turnbuckle to adjust the headstay while the sail is still on the roller. Anyway, I eased the backstay and tightened the headstay turnbuckle three revolutions. I then tightened the backstay and after that tightened the inner forestay to give the mast a slight bend. I can say that I now have a "feel" of how to go about tuning my standing rigging, which is about time given that I've sailed 1/3 of the way around the world.

This morning I found that I had to mix up a small batch of epoxy to tidy up some flaws in yesterdy's filling work. I then check the patch up work in the ceiling and it looked very good. On that basis I put the two ceiling panels back up, pleased to note that this marked the start of putting the boat back together again.

I saw Joe at BUMS and asked him about the antifouling he is using on Pachuca. He's using the premium stuff which he says is 70% copper. I didn't think that it was possible to have than much copper in antifouling but he insisted that it was seven zero percent copper. If it is that strong then the third coat should surely see me through to Australia if the boat doesn't sink from the sheer weight of the copper.

Arnold and Sandra came by with their visitors Willie and Jacky, who are about to embark on one of those coastal cruises to Alaska. Willie came on board and I gave him a tour of my shambolic boat. After they left I used the Dremel tool that Arnold had brought to clean up the end of a toggle pin that had been giving me trouble.

Tomorrow is Saturday. I'll put two coats of paint on the repairs that I made on the deck then visit Arnold and Sandra for the weekend. At this point I am at the mercy of Dan and his reception of equipment that he has ordered for Pachuca.

So the things left to be done are:

- Third coat of antifouling (to be done early next week by BUMS)
- Rigging work (by the end of the week hopefully)
- Return of my head and main sails from the sailmaker (promised by Friday)
- Engine maintenance (after boat is in the water)

Once the boat is in the water and I have access to running water again I'll have to spend at least half a day cleaning the boat from stem to stern.

The top photo shows the leak repair work in the ceiling.

The second photo shows a treat that I got for Pachuca, even though she has cost me a lot of sweat, worry, and money: a digital temperature and humidity guage.

Wednesday, July 15, 2009

Small Jobs

I spent literally hours cleaning the places where I had removed fittings. Scraping every bit of sealant off in preparation for filling in and painting was a tedious and slow job.

Dan passed by and offered to lend me the pickup to take the headsail to the sailmaker's. I replied that it was less than a year old and that it was OK but after some reflection I realized that I only thought that it was OK. Maybe the sail maker would spot and correct a problem before it got serious. So I took the sail to the loft this afternoon and two of the women helped me to drag it inside. Gee I like that place. Maybe I can put on some drag and apply for a job.

I removed the jib halyard and will hand it in tomorrow for a replacement.

I had a chat with Joe at BUMS about the antifouling. I told him that I accepted that their antifouling was good for 2 years, but that would be here at latitude 48. I had 20 months of sailing ahead of me and much of it would be in the tropics. It seemed to me that a third coat of antifouling could make the difference in getting me to Australia without the need for another haulout. He agreed, so next week he will give the hull a light sanding and put on another coat of antifouling.

Tuesday, July 14, 2009

Rigging and Sails









I started the morning by removing the organizer blocks from the cabin top. Fortunately Dan came by and saved me from big task of removing the foremost cabin ceiling panel by suggesting that I pry open the aft edge only and reach in with a wrench to undo the nuts. That worked fine.

After handing in the cleaned-up traveller and deck gear I turned my attention to dropping the mainsail. Dan and Lisa were too busy to drive the sail to the loft so they gave me directions and the keys to the business Toyota pickup truck. I told them that I would be driving with a Western Australia driver's license but that it was my understanding that there was a reciprocal agreement between the US and Australia on mutual recognition of each other's driver's license. Lisa overcame her doubts and gave the OK then I wondered out loud why everyone drove on the wrong side of the road and had their steering wheels on the wrong side of the car. The pickup had a floor manual shift and thanks to the 25 years with my VW Beetle I had no problem.

The loft was very interesting. There were six people at work and they were all women. The place was cheerful with great music coming from somewhere. I asked about the building and it had been a US Coast Guard armory many years ago. The brief regarding the mainsail was simple: check it out to a standard for rounding the Horn and sailing back to Australia.

I returned to the boat and decided to drop the jib so that I could recover the halyard for a replacement. The wind speed was 3-4 knots coming from directly ahead which was good for rolling out the entire jib before dropping it. I rolled it out OK and dropped it but 2/3 of the way down the system jammed up and I could not get the jib either up or down. Fortunately the rigger shop was still open and soon Lisa came over for a look. She noticed that some of the screws holding down the extrusions (a series of tubes going up the length of the headstay) had backed out and were standing proud.

Soon Dan was up doing his Spider Man act and unshackled the jib to let it drop. The using a rubber hammer he loosened things up and screwed down the proud screws. Everything was safe and soon he will bed the screws with Loctite after perhaps reinstalling all of the extrusions.

What can I say? This was supposed to have all been fixed in Hawaii and I thank my lucky stars that we found the problem at the right place and the right time. If something like this were to happen at sea I'm not sure what I would do.

In the middle of the day Doug Roth came by to gas up the refrigerator. Unfortunately there was a third leak! It was in that same area where the tubing passed through the wall. Doug was undaunted. He sanded the entire area and epoxied the that entire section of tubing. He'll be back.

Monday, July 13, 2009

Busy Monday





The first thing I did this morning was to investigate the possibility of moving two of the batteries in the rear of the boat so that I could get good access to the stern of the boat below the cockpit to look for possible sources of water leaks. I removed the wooden clamp holding them down and moved one of the batteries around go gauge its weight. It was seriously heavy. I managed to slide myself on top of the batteries to get a good look at the area in the back with a strong light. Everything was dry and the hosing appeared to be in order. The design and construction of the rudder post housing seemed to prevent any possibility of leaks. There was some minor leakage from the cockpit around the binnacle into the lower area. I felt the two clamps at the top end of the muffler and they were secure.

It did not make sense to me to go to the effort (and risk) of removing the batteries for a closer while I wasn't sure that there was a leak in that area. Now that I knew that I could squeeze in far enough for a good look I decided to inspect the area when when we are sailing hard to windward.

I've included a photo of the four batteries in the stern. The two lower ones are the original Delkor batteries for starting the engine. The two upper ones are two of the four gel batteries installed in Opua, New Zealand. That black pad on the side of the battery with two attached wires is the temperature sensor, required because gel batteries can overheat and burn.

After that I removed part of the ceiling on the starboard side of the cabin and exposed the area to be treated for leaks. The problem appears to be identical to that on the port side which Arnold and I successfully treated in Hawaii. I'll do the same fix with epoxy and am fairly optimistic about the result.

Then Dan from Port Townsend Rigging paid his visit and my task list was significantly changed. The good news was that he thinks that my rigging is OK. The age of the rigging (about 4 years) and the mileage on them (8000 nm perhaps?) is well below the expected life of the rig. I attribute to the failure of my headstay to excessive flexing because it was allowed to get too loose. I cannot explain the corrosion failure of the inner forestay.

Dan then turned his attention to the various deck fittings with the thoroughness that I have come to expect. Many of my blocks are undersized. Three of them have sheaves for wire and not rope and must be replaced. The blocks on the traveller are in particularly bad shape. I knew this when I left Fremantle but was too busy to take the time to lift the track off to get access to the blocks.

The four wooden platforms on the cabin to accommodate winches for serious ocean racing were cracked and would not last much longer so it was agreed that I would remove them and the two wooden bases for the stainless steel manager of the lines between the mast and cockpit to be replaced with synthetic material.

The attachment of the topmost slide of the mainsail was badly frayed and would have to be repaired by a sailmaker. I would drop the sail, pack it, and lower it to Dan who would take it to the sailmaker in his vehicle.

We agreed that a new topping lift arrangement would be set up using an external sheave at the top of the mast and the freed internal sheave would be used for a second halyard. This would act as a backup for the main halyard and would allow me to set up the trysail complete with its own halyard and ready to go up at short notice.

I would drop the headsail and remove the halyard for inspection and possible replacement.

Changes would be made to the boom vang. A new attachment would be made on the mast to replace the awkward one at the base of the mast. Also, one of the ropes would be replaced with spectra or similar standard.

Dan would try to find a short section of track compatible to what is already up the front of the mast in order to carry the spinnaker pole at the front of the mast instead of on the deck.

The first thing I did after Dan's visit was to remove the traveller. I have enclosed photos of the removed traveller and a closeup showing the pitiful state of its sheaves, this on a boat trying to circumnavigate the world.

Then I removed the four wood winch bases on the cabin. The photo shows the first one that I removed. You can see that the original base was of fiberglass molded on the deck. The wooden bases were put on top of the fiberglass bases to accommodate bigger winches. The plan is to clean off the fiberglass, fill in the holes, then sand the area smooth.

This will extend my hardstand time well into next week.

Oh, and I got word on that gear that I need for my port spinnaker winch. The good news is that the part is available. The bad news is that it will cost $237 USD.

Sunday, July 12, 2009

Boomer Encounter

Last week, returning from Port Townsend, I had to wait at the Hood Canal bridge while a span was opened for a boomer submarine from Subase Bangor.

The first photo shows the entire sub; the second photo shows several of the crew on the conning tower (note that one is looking at me with binoculars); the clip shows the sub moving past the bridge.

If you want to see one of the subs, come to Washington State. Once the subs submerge off the coast, they stay submerged.

--






Blog Archive

Contributors

Statistics Click Me