This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.

Pachuca

Pachuca
Pachuca in Port Angeles, WA USA

Tuesday, August 4, 2009

Port Townsend Street Scenes




















The schooner with the tan sails is framed by the "Tree of Life", donated by a Chinese emperor's son.

The small frame building numbered 1303 is a dental office, high on the ridge with spectacular views that can be glimpsed through the window.

The flowers are dahlias and liliams that seem to thrive next to the beach.

There is a photo of the foyer of a beautifully restored hotel.

Brenda took the photos of the resting guitars. (While my guitar gently sleeps)

The skate part was the best that I have ever seen and well used by young virtuosos who provided great entertainment with their amazing feats.

Friday, July 31, 2009

Rigging Stuffup


This morning when I visited Dan at Port Townsend rigging he had a shock for me. When he removed the roller furler drum to replace it with the new one he found two deep scores around the headstay which had been caused by screws being placed too deep during the modification work that had been done in Honolulu. The headstay, less than three months old, was a total write-off.

If I had opted for the repair of the old drum rather than total replacement the problem would not have been detected and the forestay would have eventually failed without a doubt. Dan had offered the repair option in good faith trying to offer me a way to hold down costs but he said that he has learned a lesson from this experience.

The photo shows the scoring of the wire. After photograhing the section of wire I returned it to Dan so that he could put it into what he calls his "scary box" with which no doubt he will terrorize his customers.

Pachuca Back In The Water






I was given all of 20 minutes notice that Pachuca would be lowered into the water this morning. I was the only person on standby who was ready so I got the hoist. Pachuca had been on the hardstand for about 34 days.

Fortunately I was assigned a berth right on the fairway leading to the lift. There was a gentle wind from slightly starboard of the bow. When the slings freed me I asked the lift driver to pull my stern to his side, my starboard, with his boat hook. I then gave the boat a bit of reverse and the prop walk moved the stern to port. As I drifted back the wind would move the bow to port and I would give the boat a short burst of reverse to bring the stern to port. I got about 3 boat lengths downwind of the berth then I drove forward and eased into the berth on the port side of the fairway. Brenda was in position on the jetty, took my lines, and also reminded me to put out my fenders, which were inboard and all ready to be put over the side. The whole thing was calm and drama free.

Late in the afternoon I tried to connect to the power and found out that the jetty has 30-amp plugs whereas the hardstand area had 20-amp plugs. I will try to organize a 30-amp plug tomorrow.

Brenda in Seattle


Brenda's plane from Honolulu arrived one hour late but otherwise the trip went well. I had made my way to Sea-Tac airport through a sequence of two buses, one ferry, one train, and one more bus. On the return trip we cut out the train and with good connections made it from Seattle to Port Townsend in just under 5 hours. The duration was not a problem because the weather was good and the trip was a good touring experience for Brenda. I took the photo of Brenda on the ferry to Bainbridge Island, with the Seattle skyline in the background.

Tuesday, July 28, 2009

There is a God in Heaven

Doug fixed the refrigerator in the nick of time before the beginning of the biggest heat wave Seattle has had in many years, if not ever. The temperature has been running in the high 90's F. The prediction tomorrow is 97 F. That's pretty hot for a city at latitude 48 N. I've been surviving with a fridge full of ice cold Heineken beer. Hallelujah!

Today I rearranged the boat and cleaned it up in anticipation of the arrival of Brenda who will land at Sea-Tac airport tomorrow (29 July) at 10 PM. I will leave tomorrow morning to make the bus-ferry-bus trip to the airport. We will return the following day by the same route. Shannon at Port Townsend Rigging did a great job of finding the bus schedules for me.

This morning BUMS put that extra coat of antifouling that I requested.

Arnold dropped by to pick up his motorcycle seat that had been upholstered by Sea Bear Canvas above the rigger's premises. They did a brilliant job and Arnold was very pleased.

I am on standby for having Pachuca returned to the water from Friday onwards. Joe from BUMS says that it will probably be on Friday. There is a good chance that the lower extrusion will arrive and Dan will be able to put together the forestay before the lift. Otherwise the boat will go into the water with two halyards holding up the mast in place of the forestay.

With luck the diesel maintenance will be done on Monday or Tuesday of next week and Pachuca will be cleared for sailing at midweek.

Saturday, July 25, 2009

Meetings

On Thursday I met with Lisa and discussed the remedy for the Profurl system. The choice was whether to repair the existing drum or replace it with a slightly more robust one. In either case a new lower extrusion was required. Dan said that he could repair the drum with confidence that it would get me back to Australia OK. However, after looking at the stripped threads and extra holes drilled in an attempt to keep screws in I realized that I had had enough of that drum and elected to get a new replacement. That will add $1,000 to the roller furler cost.

On Friday I visited Kelsey to discuss the proposed sail repairs. We went through the proposals line by line. The big change was that we've taken the replacement of the UV edging on the jib off the table, saving about $1300. If I expect to be in a tropical port for more than a few weeks I'll drop the jib and store it below to protect it from the sun. I had the bright idea of dropping off the jib next week and sailing the San Juans with one of my spare jibs, the light one Kelsey was delighted because it allows them to work while I am away. I am to be back by 4 September to hand in the mainsail for its repairs, which will require about 3 working days.

Incidentally, much of the chafing damage to the jib was exacerbated by the loose headstay that I ran with between Australia and New Zealand. Between damage to the jib and the roller drum that problem has cost me plenty. Another hard earned lesson for me.

Refrigerator Working


Doug Roth visited the boat for the 5th time and found that the refrigerator tubing had no more leaks. He evacated the gas from the tube with the pump shown in the photo then charged up the unit with Freon 12. Two hours later I had an ice cold beer from the refrigerator. For Quality Assurance reasons I soon had a second cold beer. I then decided to mop up some water at the bottom of the refrigerator compartment and found that it was covered with a layer of ice. Just before Arnold arrived I had a third cold beer under the well established principle of longtitudinal camparative consistency analysis (translation: I felt like another beer). Doug will return on Monday to make sure that all is well and I settle with him. Doug is the old fashioned we'll fix it no matter what kind of guy, which is in sharp contrast to the swap jockeys that prevail today. He never gave up. Monday will represent his sixth trip to the boat.

Last night after dinner I opened the package containing the new Bosch temperature sensor for the SABB diesel. It appeared to be the correct part. Arnold did some research on my behalf and this morning I ordered a new cooling fan which I will set up to evacuate the heat from around the refrigerator compressor and coils. I also ordered an up-market 12v-120v 300 watt inverter that puts out a true sine wave.

This morning we purchased a 10-ft pressure treated plank at Home Depot for under $10.00. We had it cut in two and I will stow them below for use as fenders when tied up to pylons.

Blog Archive

Contributors

Statistics Click Me