The boat is ready, the bills have been paid, and we are clear for sailing tomorrow. We plan to head for Aleck Bay, at the southern end of Lopez Island, only 20 nm from Port Townsend as the crow flies. If there is a SE wind blowing we will anchor at Mackay Bay instead.
We plan to take it slow and easy and move at a pace with which we are comfortable. We will work our way to False Creek near Vancouver where we will spend 4 or 5 days exploring the city.
So as of tomorrow I will be sending the blog entries from the boat via Sailmail.
This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.
Pachuca
Pachuca in Port Angeles, WA USA
Friday, August 7, 2009
Wednesday, August 5, 2009
Minor Works
Yesterday I installed a 12V extraction fan to ventilate the space under the starboard quarter berth that houses the refrigerator compressor. The idea is to suck cool air from louvers at the side of the bunk and pass it over the compressor and out the other side. I will have to go to the trouble of setting up some sort of barrier to keep stores away from the fan opening but having an efficient refrigeration system warrants the effort. I expect this to be of particular value in the tropics.
The other photo is of the LED lighting in the head. In Hawaii I set up the strip of 6 LED's, hard wired and permanently on. This week I put up the round light at the left, a stand-alone set of 3 LED's powered by 4 AA batteries that are alleged to last for 16 hours of lighting. You turn it on and off by pushing on the plastic front. It also has an automatic turn-off timer that I have set to about 3 minutes.
SABB Parts Available
I've just seen the following response regarding the availability of SABB parts:
Hello Robert Morales: I see no problem with getting the parts for the rebuilding of your engine. I carry most of the parts in stock in my warehouse; however, I do not have a manifold or heads on hand. That will take approximately three weeks to receive from Norway by normal carrier. We can have them send overnight; however, that is very expensive.
As long as I have your engine serial number, 2GHR-79-190, we should not have any problem with getting the correct parts for your engine. The only difference in your manual should be in the different types of propeller and gear boxes that are available to different 2G engines. The engine blocks are the same.
I look forward in working with you on the rebuilding of your engine.
Bill Miller
Sabb America East, Inc.
Tuesday, August 4, 2009
Engine Troubles
Yesterday work began on the maintenance of the SABB 2G engine. Zee the mechanic reported oil leaks through the tappet cover and head gaskets.
Reg Kelly had noted the evidence of a head gasket leakage in Fremantle shortly after I purchased the boat. Howver, the maintenance people in Fremantle and New Zealand did not make an issue of it. But it does appear that the problem has gotten worse because Zee pointed out material oozing out through the gasket as the engine ran.
Zee attempted to tighten the head bolts but said that they were already at 120 ft-lbs and that it appeared that somebody else had already been in the area trying to stop the leak.
He fixed the tappet cover leak problem by making a new gasket.
Also, the primary fuel filter case was badly corroded (Mark said that it reminded him of something out of World War II.) and we replaced it with a beautiful new Racor 500FG2 that has been sited next to the engine for easier inspection and filter change. The Racor is the white object at the left in the accompanying photo.
I then had a discussion with Mark, the principal of the company, about the head gasket leak. The best case scenario is that they remove the head, skim it, replace the gaskets, and we live happily ever after. The worst case scenario is that they have to go deeper and deeper due to corrosion and ultimately do what would be basically a top end engine rebuild.
The issue is parts. Mark will not start any work until he can be sure that in the event of a worst-case scenario parts can be obtained. I have sent a description of the parts required to SABB in Norway and New York. If not all parts are available we have a show stopper. Otherwise I will probably order the head gaskets and have them fitted when I return to Port Townsend in early September, and be ready to order other parts if they are required. Zee says that the full top end job would take only about 3 days, done in situ.
I asked Mark if the engine would be worth saving. His reply was a definite yes. The rule of thumb is that a new engine would cost that amount again for the installation (for a total of about $15,000 USD). A rebuild, even with the high cost of parts, would be cost-effective. Mark noted that all of the channels through which the cooling salt water passes would be replaced, which I found very attractive.
Do I need this? No. Am I tired of spending money? Yes. On the other hand, I can't risk an engine failure down in the wilds of Patagonia. Also, SABB's are much better known in the USA than in Australia. Zee says that they were being sold in the USA well into the 80's. He knows the engines well and thinks that they are great. He also thinks that it was rising emission control standards that killed them off in the USA. There is logic in doing the work here.
This realizes an anxiety that I expressed to Brenda a few days ago while I was knocking on wood: that the only major part of Pachuca that I had not worked over was the engine. I guess I didn't knock on that wood hard enough.
... Like the wise man told me many years ago, with boats you pay now or you pay later but you always pay.
On the brighter side, the engine and transmission have had their oils and filters changed. The fuel filters and the zinc anodes have also been changed. They are now in a fully maintained state and the engine starts and runs beautifully. No water has been found in the oil. Zee commented how the effective the cooling is at present. (Question: is it all good enough to get me back to Australia?)
Departing Neighbors
We had the pleasure of having Pachuca berthed nose to nose with John and Marty's Bayliner 38 Maris Stella. They were very helpful with good information on cruising the San Juan and Gulf Islands.
This morning they departed for their return to Lake Washington.
(John and Marty, you can enlarge the photos by clicking on them with the left mouse button.)
Visit to Point Hudson Marina

Point Hudson Marina is adjacent downtown Port Townsend. It will be cordoned off and be the center of the Port Townsend Wooden Boat Festival (Sept 11-13).
All of the frame buildings at Pt Hudson have the US Coast Guard look and feel. Indeed, the sail loft on the town side of the marina was once a Coast Guard armory. So marina and its surrounds represent what must have been a major US Coast Guard base.
If you enlarge the photo of the house shown in the bottom photo you will see that it was the Commander's beach house. Presumeably he went back to the comforts of Seattle during for the winter months. Great duty, huh?
The photo of Capt Bob trimming the sails of the fully wooden boat shows the trailer/RV park along the beach front.
Port Townsend History
Port Townsend is a pretty town in a magnificent setting, which is not unusual in this part of the world. However, the size and quality of many of its buildings sets it apart from its sister towns on this side of Puget Sound. The dates on the buildings in the accompanying photos indicate that Port Townsend's heyday was in the late 1800's. Brenda and I thought that this was all the result of a timber and fishing boom, but when visiting the court house building a local explained that the history was more complex yet simple at the same time. Below is my understanding of what happened.
In the 1880's Port Townsend was the city of Washington State - the principal port and destined to be the state capitol. Regional development was focused on the town and the population reached 8000. Seattle was a small town. The rail head was at Tacoma. I could envision the bay in front of Port Townsend filled with square riggers from all over the world, given that Port Townsend would have been the principal port for the entire Northwest.
Then it was decided to push the railroad not up the peninsula to Port Townsend, but to Seattle. The local said that "overnight" the population of Port Townsend plunged from 8000 to 800 as the action shifted to Seattle. Only recently has the population reached 8000 again.
This story reminded me of the competition between Esperance, Albany, and Perth in the early days of Western Australia, settled when the railroad between Kalgoorlie and Perth was built.
Many of the buildings and houses of Port Townsend have a Victorian flavor. The two photos at the bottom represent the confidence of the era. The building with the grey stone is the post office. The one in the bottom photo with the red brick is the court house. The clock tower is 100 ft high and the clock keeps correct time.
Subscribe to:
Posts (Atom)