This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.

Pachuca

Pachuca
Pachuca in Port Angeles, WA USA

Saturday, March 13, 2010

Solenoid and Visit

Arnold and I had a very successful day with the rewiring of the starter switch.

We were surprised and delighted to learn that the "battery" cable to the solenoid does not come directly from the starter bank of batteries but first passes through the master switch. This solved our "consistency" problem of how to power the starter switch from the "stater" bank of batteries under the control of the "starter bank" master switch.

Our plan immediately became simple: run a wire from the heavy gauge battery connection on the solenoid back to the switch and from the switch run a wire back to the smaller post on the solenoid where the activation takes place. We took great care to make the wiring as resistance free as possible. Arnold used his soldering skills to make make a good and very direct connection between the new 12 gauge marine grade wires and the switch wires. At the engine end I put on "yellow" size crimp on connectors which Arnold finished off with solder. I took pains to sand paper the posts on the solenoids and the nut and washer fasteners.

Another thing, and this may be important. A knurled nut is used to hold the push button switch in place. Arnold discovered that there was a second nut inside the flexible rubber covering. It appears that that second hidden internal nut would have inhibited full depression of the starter button, which could have been the source of our problem. I reassembled the starter switch with only the one nut and the action of the switch was ... well ... in the class of "I never knew it could be like this!"

We fixed in the new wiring and tried the starter and it worked with no problem. We read 10.7 volts going into the solenoid while the starter was turning, which was not quite the 11 volts that Mark would have been happy with, but was according to Arnold significantly better that the 9V+ that we had been getting before. The "battery" cable voltage at the solenoid read 12.6V static but we didn't think of checking it when the starter was turning. Arnold thinks that there may be a voltage drop associated with routing of the cable from the battery to the master switch to the solenoid.

Anyway, Arnold and I had worked slowly, patiently, and methodically and we were confident that we had done as good a job with the rewiring of that starter switch as possible. Time will tell if that work solves our solves our starter problems, but we are confident.

At 3.15 PM Arnold and I went ashore for showers and to purchase some wine in preparation for a visit to Peter and Cheryl Ainsworth aboard their S%S designed Hylas "Stolen Kiss". Peter and Cheryl are old hands at the Western Australia sailing scene and are long time members of the Fremantle Sailing Club. They knew Pachuca and one of her previous owners, Gavin Abbott, very well. Fortunately for us Peter and Cheryl anchored their boat only a few hundred meters upwind from us so the Zodiac ride to their boat, though choppy and a bit wet, was mercifully short. We arrived at their boat at 5 PM and had a wonderful two hours discussing a wide range of issues over nibblies, beer, and wine.

Thanks to Peter and Cheryl I KNOW WHAT THE NAME OF THIS BOAT "PACHUCA" MEANS. Gavin Abbott, the owner of Pachuca previous to the partnership of 3 who owned her for 6 years and from whom I purchased her, was a mining engineer. In mining, a "pachuca" is some sort of blower-equipped device that is used to separate dust and other material in the processing of gold ore. Brenda and I had been aware that a "pachuca" was used in the processing of gold, but now we know for sure that this is what the name of this boat actually means.

It is fortuitous that the name "Pachuca" is very favorably received in the Mexican world, being both a city in Hidalgo province and a female member of the "zoot suit Spanish American subculture of decades ago. But if I am asked by my Mexican amigos I will have to be honest about the real meaning of the name.

Peter and Cheryl plan to set off in a few days to explore the Sea of Cortez to the north which is precisely what Arnold and I plan to do. We hope to see them again before either of us depart, and we hope to see them during our journey to the north. But regardless, we'll have each other's blog addresses and I am looking forward to seeing them in Fremantle in April 2011.

----------
radio email processed by SailMail
for information see: http://www.sailmail.com

Friday, March 12, 2010

Internet from La Paz

Arnold and I went ashore with our laptops in hand. Fortunately my little acer fits nicely in a zip lock bag which then goes into the computer carrying case which then goes into a big garbage bag which then goes into a splash resistant laundry bag. This is the sort of care I must take to protect that vital piece of equipment from the dangers of salt water when I take it on the Zodiac. Arnold took similar measures with his laptop.
The first order of business before visiting the internet cafe was to drop by Lopez Marine for that marine wire for our starter button. I purchased 12 meters of 10 gauge marine grade cable, coated red.

We then visited the internet cafe which was very modern and comfortable. Unfortunately the internet service was up and down like a yo-yo. One of the staff rebooted the router twice but Arnold and I could see that the problem lay beyond the internet cafe. A local patron later told us that for the last week there had been problems associated with a damaged fiber optic cable.

Nevertheless I was able go get through my email and publish a few photos on the blog. I tried uploading a video but after watching the upload creep along for close to 45 minutes the upload abruptly stopped and it was all for nothing. Arnold then left and I went upstairs to call Brenda in Australia via Skype. We had a very good conversation with camera images and all for about 20 minutes and ... then ... the cafe lost electric power and everything dropped dead. I packed up and as I walked along the street I could see that the entire building had lost power.

Arnold and I had our usual afternoon lunch at the marina cafe. I ordered fillet of fish with garlic, the waiter asked for the dish number, I scanned across to the beginning of the line and said "99" which was off by one line so I had my first octopus in memory.

We returned to the boat at about 4 PM to relax and have a good night's sleep in preparation for the switch rewiring job the following day. Our plan had been to take the power for the push button starter switch from the bus bar behind the breaker panel. However, I later realized that this would violate the principle that all engine starting power emanates from the "starter" battery bank. If we proceeded as planned the starter switch would rely on the "house" bank and the rest of the starting system would rely on the "starter" bank. That would work fine but could lead to problems and confusion in the future. Our plan was altered to trace all of the relevant wiring, draw a schematic, and try to power the switch from the "starter" bank.

Arnold made a reservation with Alaska Airlines to fly from La Paz directly to Seattle on April 12. So we will return to La Paz on the 10th or earlier to make sure that Arnold catches that flight. As I have outlined already I will then stay in La Paz for a few more days re provisioning and preparing the boat then will make my exit from Mexico and head for Costa Rica.

----------
radio email processed by SailMail
for information see: http://www.sailmail.com

Photos from La Paz





- Filling up the water jugs at the dinghey dock. The three dark blue ones hold 6 gallons (22 liters) and provide the emergency reserve. The two light blue ones hold 10 liters and are used for bathing, general cleaning, and also for collecting rain water.

- The photo of the channel approach to the anchorage shows how serious the markers must be regarded. The ship in the background is way out to sea.

- Pachuca at anchor (second boat from left), with her mainsail yet to be zipped up.

- The beach front of La Paz. This long walk has been very well done and is a feature of La Paz.

Anchorage at La Paz


The accompanying photo of the chart plotter screen shows where Pachuca is anchored. The cross hairs are over the dinghy dock at the marina and the data at the top shows the distance from Pacuca to the dinghey dock to be 0.220 nautical miles.

Note the track of Pachuca as we motored from the top right. The long narrow bay between El Mogote and La Paz shallow, so the long channel to La Paz has been dredged.

Thursday, March 11, 2010

Cruising Plans

This is the latest version of my cruising plans.

Arnold plans to depart the boat about mid-April. It is highly likely that he will fly out of La Paz. I will probably remain in La Paz for another week provisioning and preparing the boat and depart in the last week of April.

Brenda and I have agreed that she will meet the boat in Costa Rica. This will avoid the problem of my having to arrive in Puerto Vallarta or Acapulco on a tight schedule to meet an airplane. It will also allow me to clear the hurricane belt quickly because I should be out of the area by mid-May. (A big worry is that this is an El Nino year and they are expecting more hurricane activity.) Also, this spares Brenda the ... hmm ... challenge of crossing the notorious Golfo de Tehuantepec with its ferocious waves and huge seas.

Then the question is how am I going to get from La Paz to Costa Rica.

The orthodox way is to work one's way down the Mexican coast to the northern end of the Tehuantepec. There is a port where cruisers wait until they get the "go" signal from the port capitania which signifies a few days of calmer winds. At this point the cruisers sail as fast as they can staying a mile or 2 off the coast and get to the south side as soon as possible.

But here I'm afraid that I am reverting to type. Sailing alone I do not want to deal with the hassles of sailing close to the coast and dealing with associated dangers such as reefs, lee shores, fishing boats, crab pots, etc. I can see myself dead tired and afraid to heave to because of my proximity to shore or perhaps a frantic race to avoid the winds of Tehuantepec. I also want to avoid the time and hassle of going in and out of anchorages.

So at this point my plan is to formally exit Mexico at La Paz and heading S or SSW, putting more distance between myself and the coast, which falls away to the SE, with each passing day. I'd like to clear the coast of Golfo de Tehuantepec by about 300 miles, hoping that the winds that are funneled through that gap have largely dissipated that far at sea. Once I am past these hazards I will approach Costa Rica from the NW.

The fact is that given that Pachuca has proven herself to be a very good and strong sea boat I feel safer far out at sea than near land. Out there I can rest when becalmed or under sail, and I can always heave to the way sailors have done for hundreds of years.

In summary, I plan to depart La Paz Mexico in late April and sail for Costa Rica in a big loop of about 2500 miles. This will be a major crossing and I would hope to make it within 30 days.

Looking further down the track, Brenda must be back in Australia by sometime in September, so after seeing her off I would head for the Galapagos probably in October with a view to reaching Puerto Montt in Chile in November. That will be my springboard for the Horn in December.

----------
radio email processed by SailMail
for information see: http://www.sailmail.com

Boat Bound

The strong northerlies that we have been expecting for days finally arrived.

The morning started relatively calm as usual, though we were warned during the VHF 22 session that we could expect wind speeds of 10-20 knots overnight.

Arnold and I put in an hour investigating the starter problem. We were hoping that the starter would fail so that we could do certain experiments to isolate the problem. But we had bad-good luck and the engine cranked each of the four times that we tried the starter. Nevertheless we think that we made progress. The wire from the push button starter to the solenoid appeared to be copper with no tinning. The connector to the solenoid appeared to be in bad shape. I checked the voltage coming through that wire while Arnold held down the starter button and the maximum I could read was 9.88 V, whereas using the same grounding point I had read 12.6 V on the battery cable to the solenoid. At this point we plan to replace the entire starter switch wiring, taking the power directly from the bus bar behind the breaker panel. We'll then go off for a couple of weeks exploring some of the islands and bays to the north and see if the starter behaves itself. If it doesn't at least we will have eliminated the switch wiring as the problem and can look at problem in the starter-solenoid combo.

Arnold and I went to the marina for showers and a shave for me. The plan was to return to the boat after the showers, pack our laptops, and head off for the internet cafe and from there I would get the electrical wire for the starter switch job. However, the wind had picked up by the time we returned to the boat and Arnold got a bit wet from the spray. Over the next two hours we watched the wind speed increase from 15 to 20 knots and we did not want to risk damage to our laptops by trying to get ashore and back in these conditions. We were resigned to having an easy day on the boat which suited me because I was pretty tired from the activities of the previous few days.

I cooked spaghetti for lunch and had a nap. Then I got up thinking that this might be a good opportunity for installing the new outlet hose for the toilet. I uncoupled the hose at the toilet end and after letting the relatively clean salt water drain out compared the end profiles of the new and old hose. The old hose looked better than the new one. Whereas the new hose was made up of one layer of plastic with ripples along the inside the old hose had a second inner layer of black material that presented the advantages of a thicker laminated wall and a smooth interior. I showed this to Arnold and he agreed. He was afraid that the new hose might rupture. I was also afraid of odors working their through the hose wall to the outside. In short, I had purchased hosing that looked like the real McCoy but was not proper sanitation hose. So I secured the old hose again with the clamps and spent the next hour cleaning the head and after that the dusty navigation table. I'll probably carry the new hose in under one of the quarter berths as emergency spare.

By 5 PM the wind was hitting 22 knots and we had agreed to watch a movie.

----------
radio email processed by SailMail
for information see: http://www.sailmail.com

Blog Archive

Contributors

Statistics Click Me