I've drafted a rough plan which because it involves sailing must be taken with a big grain of (sea) salt.
Until recently my plan had been to make a leisurely exit from Brazil, savouring the delights of the many islands at Angra, then proceeding south for more leisurely visiting. I had vague expectations of reaching Australia in June or perhaps July.
While I was in the USA I picked up a comment to the blog from Jack Sullivan, a school mate that I had not have seen or heard of since 1963, 49 years ago. Soon we were in regular communication and had two telephone conversations involving Jack, Arnold, and myself from Arnold's home in Kingston.
Jack had found me rather easily using Google because he was doing preliminary work on a 50-year high school of classes from two girls' and one boys' schools. (Catholic high schools were segregated by sex in those days.) During this time Carol Fransen another organiser, telephoned Arnold quite independently of Jack and we had another great conversation. From memory, Carol and Jack go back to the third grade of primary school, as will others who will be attending the reunion.
This will probably be the last opportunity that I will have to see these people because time is moving on and we have already lost some of the group. For me the reunion will have a special edge given that I left the USA in 1966 as a very troubled young man, and for me this would represent a closure (sorry about that word, folks) on a grand scale. Besides, Arnold is also planning to attend and the group would probably get a kick of seeing the twins together again.
The reunion is on 8 June in Mobile, Alabama. To make that journey I would want to arrive in Fremantle no later than 30 April because I will need the time to see my friends and well wishers before I depart. With this new constraint in mind I have made the following calculations.
The nautical distances involved are approximately:
1. Brazil-Tristan de Cunha, 1900 miles
2. Tristan de Cunha-Cape Town, 1500 miles
3. Cape Town-St Paul Island, 3000 miles
4. St Paul Island-Fremantle 1800 miles
I estimate the following days of sailing involved under two assumptions of my average number of miles covered per day: 80 (very pessimistic) and 100:
1. Brazil-Cape Town, 34-42 days
2. Cape Town-Fremantle, 48-60 days
The “worst case” time, including a 3 day stay at Tristan de Cunha and only a sail-by of St Paul, is 105 days, or roughly 3.5 months. A six-week visit to Cape Town would add another 1.5 months, yielding a total of 5 months. Clearing the Brazilian coast in mid-December would put me in Fremantle in mid-May.
I hasten to emphasize that the above is “worst case”. “Best Case”, including a 5 rather than 6 week stay in Cape Town would put me in Fremantle at about 18 April. If conditions when I arrive at Tristan de Cunha are not suitable for safe anchoring then another 3 days will be saved. Also, I can pick up a week if I clear the Brazilian coast by 8 December.
It's worth a shot. One advantage from this new schedule is that it will put me in Fremantle before winter.
This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.
Pachuca
Pachuca in Port Angeles, WA USA
Wednesday, November 21, 2012
More Preparations
Yesterday I fitted the water vane of the Monitor wind steering. That went well probably because I didn't treat it as a routine job but rather a serious one with risks of losing tools, the vital pin, and even the water vane itself into the water.
I also put up the headsail. It is a heavy beast and I worked in small steps to avoid damaging my back or the equipment. I managed to get the sail bag up onto the foredeck through the forward hatch then laid it out on the port side of the inner forestay because the wind was gusting gently from the starboard quarter. I added a second shackle at the peak of the sail because I didn't like how there was a 90 degree twist in the strop at the peak of the sail when it was attached to the single shackle on the Proful roller. By the time the peak of the sail was connected with the shackle moused with wire, and both sheets in place, the wind strengthened and began to veer to the port side of the boat. It was at this time that I decided to stop working on the headsail and turn my attention to the Monitor water vane.
By the time I had finished work on the Monitor the wind was off the port bow and moderating, so I man handled the sail to the starboard side of the deck and decided that it conditions were safe enough for a hoist, In fact the conditions were perfect because you want a bit of wind from the side to give the sail shape while it is being rolled in.
I started off by attaching a snap block to a ring on the mast then passing the halyard to the bow. In this way I could pull on the halyard while feeding the sail into the track. Thereafter I would line up a few feet of luff under the feeder, go to the mast, and use my weight on the halyard to raise a few more feet of sail. I would then snub off the halyard, go forward and line up more sail luff, and repeat the process. When the sail was about 1/3 up there was too much weight for this hand work so I passed the halyard through its normal path to the starboard cabin winch. Then it was a methodical process of lining up a few feet of luff at the bow, then going back to the cockpit to winch up more sail. When the sail was 2/3 up even the size 22 cabin winch could not cope. I used binoculars to make sure that all was OK aloft then transferred the halyard to one of the larger size 28 cockpit winches. The angle at which the halyard met the winch made it prone to a crossover and I had once ruined a nearly new main halyard by tearing the sheath during such a crossover, so I was very careful to not make the same mistake again.
When the foot was at the level of the lower shackle of the Profurl roller I fitted it to the shackle (again a 90 degree twist) and soon had the sail rolled in. The sail rolls “fat” partly because of the heavy weight of the cloth (9.55 oz from memory), and largely because pads have been sewn in along the luff of the sail to achieve a better shape when rolling – something that I had never seen before.
Fortunately the Proful roller has a very good feeder and the bolt rope on the sail luff is in as new conditions. Were the feeder a poor one or the bolt rope frayed, as I've seen in other boats, raising the headsail would be a 2-person job. … Also, I've made a mental note to purchase two shackles with 90 degree twists for the headsail at first opportunity.
Jobs remaining are (1) refilling an LPG cylinder (2) provisioning (3) re caulk a slightly leaky cabin window (if I have time)
I also put up the headsail. It is a heavy beast and I worked in small steps to avoid damaging my back or the equipment. I managed to get the sail bag up onto the foredeck through the forward hatch then laid it out on the port side of the inner forestay because the wind was gusting gently from the starboard quarter. I added a second shackle at the peak of the sail because I didn't like how there was a 90 degree twist in the strop at the peak of the sail when it was attached to the single shackle on the Proful roller. By the time the peak of the sail was connected with the shackle moused with wire, and both sheets in place, the wind strengthened and began to veer to the port side of the boat. It was at this time that I decided to stop working on the headsail and turn my attention to the Monitor water vane.
By the time I had finished work on the Monitor the wind was off the port bow and moderating, so I man handled the sail to the starboard side of the deck and decided that it conditions were safe enough for a hoist, In fact the conditions were perfect because you want a bit of wind from the side to give the sail shape while it is being rolled in.
I started off by attaching a snap block to a ring on the mast then passing the halyard to the bow. In this way I could pull on the halyard while feeding the sail into the track. Thereafter I would line up a few feet of luff under the feeder, go to the mast, and use my weight on the halyard to raise a few more feet of sail. I would then snub off the halyard, go forward and line up more sail luff, and repeat the process. When the sail was about 1/3 up there was too much weight for this hand work so I passed the halyard through its normal path to the starboard cabin winch. Then it was a methodical process of lining up a few feet of luff at the bow, then going back to the cockpit to winch up more sail. When the sail was 2/3 up even the size 22 cabin winch could not cope. I used binoculars to make sure that all was OK aloft then transferred the halyard to one of the larger size 28 cockpit winches. The angle at which the halyard met the winch made it prone to a crossover and I had once ruined a nearly new main halyard by tearing the sheath during such a crossover, so I was very careful to not make the same mistake again.
When the foot was at the level of the lower shackle of the Profurl roller I fitted it to the shackle (again a 90 degree twist) and soon had the sail rolled in. The sail rolls “fat” partly because of the heavy weight of the cloth (9.55 oz from memory), and largely because pads have been sewn in along the luff of the sail to achieve a better shape when rolling – something that I had never seen before.
Fortunately the Proful roller has a very good feeder and the bolt rope on the sail luff is in as new conditions. Were the feeder a poor one or the bolt rope frayed, as I've seen in other boats, raising the headsail would be a 2-person job. … Also, I've made a mental note to purchase two shackles with 90 degree twists for the headsail at first opportunity.
Jobs remaining are (1) refilling an LPG cylinder (2) provisioning (3) re caulk a slightly leaky cabin window (if I have time)
Tuesday, November 20, 2012
Back on the Internet
After a gorgeous sunny day yesterday I woke up to heavy showers this morning and didn't expect to get much done. Between showers I brought my laptop to test the wireless internet on the way to shower room and found it to be still down. On the way back to Pachuca I saw Ricardo boarding his boat after taking his dog for a walk and asked for his help. Soon we were walking back to the marina office and he had is iPad in hand in order to test the connectivity.
After a brief discussion in Portuguese Ricardo told me that the wireless service that I had been using was no longer available, and that I should another one which was password protected. Ricardo successfully connected his iPad with the password that he had been given, then I tried the connection with my Acer and Bingo! I was back on the internet again.
I told Ricardo that without his help I may have been off the internet for many more days. I gave him my thanks and I could tell that he was very happy with help that he had given to me.
After a brief discussion in Portuguese Ricardo told me that the wireless service that I had been using was no longer available, and that I should another one which was password protected. Ricardo successfully connected his iPad with the password that he had been given, then I tried the connection with my Acer and Bingo! I was back on the internet again.
I told Ricardo that without his help I may have been off the internet for many more days. I gave him my thanks and I could tell that he was very happy with help that he had given to me.
Monday, November 19, 2012
No Batteries and No Internet
This morning I arrived at Alexandre's office just before 9 AM and soon we were on our way to the battery supplier, which is a few miles this side of Angra.
Two brands of batteries were available: Moura and Heliam, both made in Brazil. We ran into the unexpected problem that Brazilian batteries tend to have a smaller footprint but more height. According to my measurements 18 cm was the tallest battery that the case would allow, as long as the posts were at one end of the battery. The batteries on offer had posts along the side and worse, the large ones were 22 cm high (excluding the posts) and the smaller 95 a/h ones were 19 cm high. Any smaller batteries were tiny golf cart sized. We agreed that I would hold off on the purchase until I had a second look at the boat's battery case with the possibility that I would somehow be able to squeeze in another 1 cm of height. If I found that I could accommodate the 95 a/h batteries the order would be phoned in and the batteries would be delivered to Alexandre's office. The company could make cables to any length that I specified. I would make sure that Alexandre would have sufficient funds to cover all costs.
Alexandre then dropped me in downtown Angra and proceeded to his private business. I visited the HSBC bank and withdrew another 1,000 Reals, meaning that I was now carrying a hefty 1,900 Reals (about $900)in my wallet. From there I decided to make the long (several kilometers) walk to the Piratas marina. Alexandre had told me that there were two boat shops at Piratas, though they were poorly stocked. I made it to Piratas and found it to be an up-market marina that included a sort of boutique shopping mall. I found a boat shop and confirmed Alexandre's opinion that it had a poor selection of merchandise. All I wanted was netting for the boat but I found none while prowling the aisles and the young man at the counter spoke no English or Spanish and could not understand my drawing of a boat with the netting which I required. I decided to walk back to Angra to purchase some provisions and possibly fresh fish, then take the bus to Frade and get off at the highway for the walk to Bracui. As I was walking out I heard Alexandre call me. He had a shopping cart full of purchases and asked me if I wanted a ride back to Bracui. I accepted his offer in order to spare myself the long walk back to the downtown area with so much cash in my wallet.
We were back in Bracui shortly after noon and when I rechecked my battery measurements I found that the 18 cm had been over generous and that there was no way that the batteries on offer would fit. I looked at the possibility of building up the sides of the battery box to accommodate the taller batteries, but that would have resulted in the gel batteries above being raised and not fitting because they would make contact with the lower end of the autopilot linear drive. I visited Alexandre and gave him the bad news and he replied that I could try to get batteries at Ilha Bella, though he figured that there would be the same selection of Brazilian batteries. I replied that with my language and transport problems I wouldn't even attempt it. I thanked him for his help, he replied that at least we tried, and that, unfortunately, was the end of the matter. I will carry on to South Africa with the batteries that I've got.
At mid afternoon I began work on the port side netting and finished the work before sunset. That's one more task off the list. ... Two, actually, because before starting on the netting I drained fuel from the bottom of each diesel tank and found it to be very good: no water as usual, none of that black slimy scum that settles at the bottom, and very little clouding.
I also checked the wireless internet service and still found it down. I walked into the office and asked if their internet was working, which it was. I then said that I had had no internet for 24 hours and the woman made a gesture with her hand indicated that the wireless service was down. I asked her if maybe tomorrow and she replied "tal vez". Because of the language barrier I am not sure exactly what is going on. However, late in the afternoon I saw Ricardo and his wife in their boat returning from the islands and tomorrow I will ask him find out what is going on.
In the meantime, I have no access to Gmail or Skype or the blog.
I checked my waist line and found it to be just be low 45", meaning that I've managed to shed about 1.25" off my waistline. Unfortunately I still have a long way to go with this project.
With the battery issue settled I am no thinking of the possibility of sailing out of Bracui at the end of November. This marina is a wonderful place - like living in a resort, really - but sailing early will be to my advantage for several reasons and quite frankly, I'm getting itchy feet,so to speak.
----------
radio email processed by SailMail
for information see: http://www.sailmail.com
Two brands of batteries were available: Moura and Heliam, both made in Brazil. We ran into the unexpected problem that Brazilian batteries tend to have a smaller footprint but more height. According to my measurements 18 cm was the tallest battery that the case would allow, as long as the posts were at one end of the battery. The batteries on offer had posts along the side and worse, the large ones were 22 cm high (excluding the posts) and the smaller 95 a/h ones were 19 cm high. Any smaller batteries were tiny golf cart sized. We agreed that I would hold off on the purchase until I had a second look at the boat's battery case with the possibility that I would somehow be able to squeeze in another 1 cm of height. If I found that I could accommodate the 95 a/h batteries the order would be phoned in and the batteries would be delivered to Alexandre's office. The company could make cables to any length that I specified. I would make sure that Alexandre would have sufficient funds to cover all costs.
Alexandre then dropped me in downtown Angra and proceeded to his private business. I visited the HSBC bank and withdrew another 1,000 Reals, meaning that I was now carrying a hefty 1,900 Reals (about $900)in my wallet. From there I decided to make the long (several kilometers) walk to the Piratas marina. Alexandre had told me that there were two boat shops at Piratas, though they were poorly stocked. I made it to Piratas and found it to be an up-market marina that included a sort of boutique shopping mall. I found a boat shop and confirmed Alexandre's opinion that it had a poor selection of merchandise. All I wanted was netting for the boat but I found none while prowling the aisles and the young man at the counter spoke no English or Spanish and could not understand my drawing of a boat with the netting which I required. I decided to walk back to Angra to purchase some provisions and possibly fresh fish, then take the bus to Frade and get off at the highway for the walk to Bracui. As I was walking out I heard Alexandre call me. He had a shopping cart full of purchases and asked me if I wanted a ride back to Bracui. I accepted his offer in order to spare myself the long walk back to the downtown area with so much cash in my wallet.
We were back in Bracui shortly after noon and when I rechecked my battery measurements I found that the 18 cm had been over generous and that there was no way that the batteries on offer would fit. I looked at the possibility of building up the sides of the battery box to accommodate the taller batteries, but that would have resulted in the gel batteries above being raised and not fitting because they would make contact with the lower end of the autopilot linear drive. I visited Alexandre and gave him the bad news and he replied that I could try to get batteries at Ilha Bella, though he figured that there would be the same selection of Brazilian batteries. I replied that with my language and transport problems I wouldn't even attempt it. I thanked him for his help, he replied that at least we tried, and that, unfortunately, was the end of the matter. I will carry on to South Africa with the batteries that I've got.
At mid afternoon I began work on the port side netting and finished the work before sunset. That's one more task off the list. ... Two, actually, because before starting on the netting I drained fuel from the bottom of each diesel tank and found it to be very good: no water as usual, none of that black slimy scum that settles at the bottom, and very little clouding.
I also checked the wireless internet service and still found it down. I walked into the office and asked if their internet was working, which it was. I then said that I had had no internet for 24 hours and the woman made a gesture with her hand indicated that the wireless service was down. I asked her if maybe tomorrow and she replied "tal vez". Because of the language barrier I am not sure exactly what is going on. However, late in the afternoon I saw Ricardo and his wife in their boat returning from the islands and tomorrow I will ask him find out what is going on.
In the meantime, I have no access to Gmail or Skype or the blog.
I checked my waist line and found it to be just be low 45", meaning that I've managed to shed about 1.25" off my waistline. Unfortunately I still have a long way to go with this project.
With the battery issue settled I am no thinking of the possibility of sailing out of Bracui at the end of November. This marina is a wonderful place - like living in a resort, really - but sailing early will be to my advantage for several reasons and quite frankly, I'm getting itchy feet,so to speak.
----------
radio email processed by SailMail
for information see: http://www.sailmail.com
Sunday, November 18, 2012
Blog Update from Sailmail
My first blog update from the boat since returning from the USA was supposed to be a test only, to validate the entire system from the new Toshiba navigation computer running the newly installed Airmail 3 software to the HF radio, Pactor III modem, and finally the email address that Stephen set up for the updates.
Unfortunately this will also have to serve as my blog update because the wireless internet service that I've been using abruptly stopped working at about 8.30 AM. The service is not available using either the Acer/XP or the Toshiba/Win7 system, so I'm confident that it is a weekend problem that will be rectified on Monday (tomorrow) morning. Until the service is restored I will not be able to communicate via either Skype or my Gmail address.
This morning I spent some time with the rigging. I had noticed that the leeward lower shrouds still looked just a tad loose when going to weather after my first adjustment so I gave them each another half turn of the turnbuckle. I also gave the intermediate shrouds a half turn but left the cap shrouds alone because they seemed nice and tight.
I then spent an hour checking out the anchor to make sure that it is ready for use. I'll keep the 45 lb plow anchor on the roller until I am on my way and well clear of the South American continent and then I'll either lash it to the mast or stow it in the clothes closet on top of the 50 lb Swarbrick. I will leave all the chain and rode up front in the anchor well. For the run to the Horn I moved all of the chain back to lighten the bow, but I will not do it this time because I expect to make landfall at Tristan de Cunha after only about 20 days after a somewhat easier passage than the Horn, given that we'll be running at about latitude 40S - about 900 miles north of the latitude of the Horn.
In the afternoon I put up new netting as before, from the pulpit to the stanchion across from the mast. Lashing the netting to that stanchion was a bit tricky because first I had to untie the ropes holding the planks to which a line of full jerry cans were attached. I then managed to pry the boards back just enough to allow me to work. Unfortunately it looks like I miscalculated and the remaining netting will be 1-2 feet short of the stanchion on the port side. I'll have to get creative and fill that gap with plenty of cord running between the end of the netting and the stanchion.
But the port side netting will have to wait one more day because tomorrow is the day when Alexandre will take me to the battery place. Fortunately I have enough cash on board and did not have to make a special trip to the ATM at Angra. The plan is for the batteries to be delivered by the company to the marina, I suppose because Alexandre does not want to be running around with two heavy batteries in the car. After the visit for the batteries I'll stay with Alexandre and he'll drop me off at Angra so that I can do some shopping. (I need a haircut but may as well wait until closer to departure time.
The starter batteries, by the way, settled down at 12.7V after yesterday's engine run and after 24 hours are down to 12.3V.
----------
radio email processed by SailMail
for information see: http://www.sailmail.com
Unfortunately this will also have to serve as my blog update because the wireless internet service that I've been using abruptly stopped working at about 8.30 AM. The service is not available using either the Acer/XP or the Toshiba/Win7 system, so I'm confident that it is a weekend problem that will be rectified on Monday (tomorrow) morning. Until the service is restored I will not be able to communicate via either Skype or my Gmail address.
This morning I spent some time with the rigging. I had noticed that the leeward lower shrouds still looked just a tad loose when going to weather after my first adjustment so I gave them each another half turn of the turnbuckle. I also gave the intermediate shrouds a half turn but left the cap shrouds alone because they seemed nice and tight.
I then spent an hour checking out the anchor to make sure that it is ready for use. I'll keep the 45 lb plow anchor on the roller until I am on my way and well clear of the South American continent and then I'll either lash it to the mast or stow it in the clothes closet on top of the 50 lb Swarbrick. I will leave all the chain and rode up front in the anchor well. For the run to the Horn I moved all of the chain back to lighten the bow, but I will not do it this time because I expect to make landfall at Tristan de Cunha after only about 20 days after a somewhat easier passage than the Horn, given that we'll be running at about latitude 40S - about 900 miles north of the latitude of the Horn.
In the afternoon I put up new netting as before, from the pulpit to the stanchion across from the mast. Lashing the netting to that stanchion was a bit tricky because first I had to untie the ropes holding the planks to which a line of full jerry cans were attached. I then managed to pry the boards back just enough to allow me to work. Unfortunately it looks like I miscalculated and the remaining netting will be 1-2 feet short of the stanchion on the port side. I'll have to get creative and fill that gap with plenty of cord running between the end of the netting and the stanchion.
But the port side netting will have to wait one more day because tomorrow is the day when Alexandre will take me to the battery place. Fortunately I have enough cash on board and did not have to make a special trip to the ATM at Angra. The plan is for the batteries to be delivered by the company to the marina, I suppose because Alexandre does not want to be running around with two heavy batteries in the car. After the visit for the batteries I'll stay with Alexandre and he'll drop me off at Angra so that I can do some shopping. (I need a haircut but may as well wait until closer to departure time.
The starter batteries, by the way, settled down at 12.7V after yesterday's engine run and after 24 hours are down to 12.3V.
----------
radio email processed by SailMail
for information see: http://www.sailmail.com
Saturday, November 17, 2012
Hull Clean, Monitor Ready, Engine Ready
On Thursday I launched the Zodiac and washed the hull of the boat. I held a slow running hose (water is plentiful in this part of the country) and washed with fresh water, dish detergent, and a sponge and in places a green scouring pad. There were 4 or 5 of black thick sticky oily patches left there by my older boat fenders during our stay in Argentina. For these I used a rag soaked with paint thinner followed by a water and detergent wash. Two of my fenders are well past their prime, with the outer covering deteriorating and becoming sticky. I'll go with what I got until the end of the cruise and purchase a new set of fenders with proper canvas covers in Fremantle.
After I finished washing the hull I stepped back and deliberated on whether or not to go to the expense of polishing the hull (Enrique estimated a whopping $250). Given that the paint job has seen better days and I am about to set off for for Cape Town I decided that polishing would be a waste. I promised Pachuca years ago that if she got me safely back to Australia I would treat her to a new paint job on her hull, and so I will, though it may take a year or two to make that happen. It will be a deluxe job with no expense spared and when it is done I hope to see a mirror finish on the hull. CUOF's can indulge in these follies. (cashed up old farts) Anyway, I finished up the day satisfied that the boat was now clean inside and out with new anodes on propeller shaft.
Yesterday I took advantage of having the Zodiac in the water to attend to the Monitor wind steering. I swapped the control lines with the new ones that I had brought back from the U.S.A. I then made sure that every nut on the unit was tight. One of the blocks was a bit stiff so I backed off on the nut and sprayed it with WD40. I made sure that the double wires passing through heads of the lower bolts were secure. This work was very, very easy with the boat backed up to the floating jetty because I could work from the jetty in relative comfort with the Zodiac positioned underneath the unit to catch any tools or fastenings that I might drop during the operation. I'll mount the water paddle a day or two before sailing.
To be honest, the cordage recommended by Fisheries Supply in Seattle for the control lines does not seem to have a particularly strong covering, which is an important issue because chafing is a bigger problem than load. Nevertheless I was told that it was what the locals use so I'll try it and see how it goes. If the lines don't last I'll make a mental note to grumble to Fisheries on my next visit then swap back to the lines I installed in MdP.
While I was sitting at my morning internet session Ricardo said hello as he passed by. Ricardo had the boat at the end and I had not seen him since before my departure for the USA. He and his wife alternate between their property toward Santos and Bracui. It was great to see him again because I like him a lot.
Just before the internet session I dropped by Alexandre's office to show him a photograph of the starter battery setup. He thinks that the batteries that I will wind up with will have their posts on two side corners rather than two end corners, meaning that I might have to find someone to make new cables. Alexandre will help me with this. It is just as well that I dropped in because he told me that Tuesday is a holiday so that we will be going into Angra on Monday.
After the internet session I popped into the marina office with a note asking for the Bracui-Angra bus schedule. When this was done the office manager used her Google translator to ask me about my departure plans. I replied on her keyboard that I expected to leave Bracui on 15 December. I also told her that I think that I am paid up at the marina until the end of November and will pay for December in a few days (when I have a better idea of the exact departure date.)
In the evening tested out the Sailmail system. This was important because for the first time I was using the new navigation computer, the Toshiba laptop that I had purchased in the USA, with its recently downloaded Airmail 3 software. All of the components played nice with each other and at 8.30 PM I sent out a test message to 3 people via the Chile station asking that they confirm reception of my test message. [All 3 confirmed my message within 24 hours.] Next I'll send a test blog update.
Today, Saturday, I had an easy morning working with the two Toshiba's on the internet. (There is a a third Toshiba, the original one on board Pachuca when I sailed out of Fremantle. It work fine and is loaded with backup software, however it has no battery and must be run directly off boat or shore power.) I upgraded their versions of Marine Plotter, installed some desktop gadgets, and found free 128 encryption program that I used to produce a secure spreadsheet containing my passwords.
In the afternoon I turned my attention to the engine and ran it for the first time since before my departure to the USA. I started off by exercising the cooling water inlet and exhaust thru-hull valves. I had left them open in case somebody tried to run the engine during my absence but I wanted to ensure that they still close and open freely. I then checked the levels and found the transmission and oil levels to be spot on then added a few ml of coolant. The belt tension was good, as usual.
Using the starter bank which was down to 12V after sitting idle for well over 2 months I manage to start the engine with a few more turns of the starter than usual. After reaching operating temperature while running at 1000 rpm in forward gear I moved the lever to neutral, pushed in the little red button to disengage the transmission linkage, then took the revs up to 2000 in order to assess the state of the fuel filter by looking at the vacuum gauge. At 2000 rpm the vacuum gauge was still on the peg, inside the little square labelled “0” on the Hg and kPa scales, and well away from the beginning of the yellow warning zone at 7 Hg and 25 kPa. I had intended to change the fuel filter on spec but decided that it would be a waste of time and material. … I like to think that my fastidious approach to fuelling (principally being careful where I purchase the diesel, adding anti algal additive, and using the Baja filter) has paid off.
The engine hours on the eve of my departure for Cape Town is 319.1.
After I finished washing the hull I stepped back and deliberated on whether or not to go to the expense of polishing the hull (Enrique estimated a whopping $250). Given that the paint job has seen better days and I am about to set off for for Cape Town I decided that polishing would be a waste. I promised Pachuca years ago that if she got me safely back to Australia I would treat her to a new paint job on her hull, and so I will, though it may take a year or two to make that happen. It will be a deluxe job with no expense spared and when it is done I hope to see a mirror finish on the hull. CUOF's can indulge in these follies. (cashed up old farts) Anyway, I finished up the day satisfied that the boat was now clean inside and out with new anodes on propeller shaft.
Yesterday I took advantage of having the Zodiac in the water to attend to the Monitor wind steering. I swapped the control lines with the new ones that I had brought back from the U.S.A. I then made sure that every nut on the unit was tight. One of the blocks was a bit stiff so I backed off on the nut and sprayed it with WD40. I made sure that the double wires passing through heads of the lower bolts were secure. This work was very, very easy with the boat backed up to the floating jetty because I could work from the jetty in relative comfort with the Zodiac positioned underneath the unit to catch any tools or fastenings that I might drop during the operation. I'll mount the water paddle a day or two before sailing.
To be honest, the cordage recommended by Fisheries Supply in Seattle for the control lines does not seem to have a particularly strong covering, which is an important issue because chafing is a bigger problem than load. Nevertheless I was told that it was what the locals use so I'll try it and see how it goes. If the lines don't last I'll make a mental note to grumble to Fisheries on my next visit then swap back to the lines I installed in MdP.
While I was sitting at my morning internet session Ricardo said hello as he passed by. Ricardo had the boat at the end and I had not seen him since before my departure for the USA. He and his wife alternate between their property toward Santos and Bracui. It was great to see him again because I like him a lot.
Just before the internet session I dropped by Alexandre's office to show him a photograph of the starter battery setup. He thinks that the batteries that I will wind up with will have their posts on two side corners rather than two end corners, meaning that I might have to find someone to make new cables. Alexandre will help me with this. It is just as well that I dropped in because he told me that Tuesday is a holiday so that we will be going into Angra on Monday.
After the internet session I popped into the marina office with a note asking for the Bracui-Angra bus schedule. When this was done the office manager used her Google translator to ask me about my departure plans. I replied on her keyboard that I expected to leave Bracui on 15 December. I also told her that I think that I am paid up at the marina until the end of November and will pay for December in a few days (when I have a better idea of the exact departure date.)
In the evening tested out the Sailmail system. This was important because for the first time I was using the new navigation computer, the Toshiba laptop that I had purchased in the USA, with its recently downloaded Airmail 3 software. All of the components played nice with each other and at 8.30 PM I sent out a test message to 3 people via the Chile station asking that they confirm reception of my test message. [All 3 confirmed my message within 24 hours.] Next I'll send a test blog update.
Today, Saturday, I had an easy morning working with the two Toshiba's on the internet. (There is a a third Toshiba, the original one on board Pachuca when I sailed out of Fremantle. It work fine and is loaded with backup software, however it has no battery and must be run directly off boat or shore power.) I upgraded their versions of Marine Plotter, installed some desktop gadgets, and found free 128 encryption program that I used to produce a secure spreadsheet containing my passwords.
In the afternoon I turned my attention to the engine and ran it for the first time since before my departure to the USA. I started off by exercising the cooling water inlet and exhaust thru-hull valves. I had left them open in case somebody tried to run the engine during my absence but I wanted to ensure that they still close and open freely. I then checked the levels and found the transmission and oil levels to be spot on then added a few ml of coolant. The belt tension was good, as usual.
Using the starter bank which was down to 12V after sitting idle for well over 2 months I manage to start the engine with a few more turns of the starter than usual. After reaching operating temperature while running at 1000 rpm in forward gear I moved the lever to neutral, pushed in the little red button to disengage the transmission linkage, then took the revs up to 2000 in order to assess the state of the fuel filter by looking at the vacuum gauge. At 2000 rpm the vacuum gauge was still on the peg, inside the little square labelled “0” on the Hg and kPa scales, and well away from the beginning of the yellow warning zone at 7 Hg and 25 kPa. I had intended to change the fuel filter on spec but decided that it would be a waste of time and material. … I like to think that my fastidious approach to fuelling (principally being careful where I purchase the diesel, adding anti algal additive, and using the Baja filter) has paid off.
The engine hours on the eve of my departure for Cape Town is 319.1.
Thursday, November 15, 2012
Hull and Batteries
Two days ago I received a message from Mark in Port Townsend asking about the new batteries for the boat's starter bank. One of the outcomes of a recent consultation session with him and a colleague at Haven Boat Works concerning my battery charging system was the recommendation that the two Delkor 130 A/H sealed batteries of the starter bank should be replaced. These batteries predate my purchase of the boat in 2005 and from memory are about 12 years old. The big problem was the likelihood that the older starter batteries were sucking the life of the newer house bank. I had a chance to replace them in New Zealand in 2008 when the boat's electrical system was significantly upgraded, but the consultant did not recommend their replacement. (Another outcome of our recent meeting was the opinion that the four size 8D Gel batteries delivering 920 A/H to the house are not overkill.)
Anyway, I replied to Mark that I had decided to try to get by with what I had until I got to Australia. That night I checked the starter bank and it was down to 12V. True, they had not been charged for about 3 months since my departure for the USA because the solar panels and wind generator charge the house bank, but nevertheless it was another indication of their age. I decided then to try to do something about the problem. What had been putting me off were the lack of transport, knowledge of where to go, and worst of all, my language problem. Fortunately I had met Alexandre of Delta Yacht Charter only two days previously and decided to try seek his assistance. He manages a small fleet of charter boats which means that he is well plugged into the boat maintenance world, he is within easy reach at the end of the jetty, he is very helpful, and he speaks English!
Yesterday morning I visited Alexandre and started off by thanking him for arranging for young Luis to do the underwater hull work because he had done a great job. Then I asked him if he could help me with my battery problem. I specified two size 8D AGM (absorbed glass mat) 200 a/h batteries to match the physical size of the existing batteries. Alexandre replied that size 8D has no meaning to his battery people and I should provide him with the actual dimensions. He also told me that AGM batteries were not available (at least in his world) so we settled on maintenance free lead-acid. I got back with the battery measurements and post locations then he made a phone call and learned that matching my specifications would be difficult with the available made-in-Brazil batteries. He planned to drive to Angra next Thursday and suggested that he take me to the battery place where he would act as the interpreter. I happily agreed.
Back at the boat I thought about the battery size question and saw right away that I don't need a 400 a/h bank dedicated solely to starting the engine (Duh!). I drew a diagram of the battery box then returned to Alexandre's office. He was of the same opinion that 400 a/h was overkill and we agreed that two smaller 100 a/h batteries would be sufficient, which meant that the new batteries would comfortably fit into the box. On that basis I will be taking plenty of cash with me on Thursday in the expectation of purchasing two replacement batteries.
During the rest of the day I wiped most of the surfaces in the cabin with a weak solution of bleach in order to remove mold, then tied most of the diesel containers to the rails, and finished up by unpacking the Zodiac and inflating it in preparation for washing the above-water part of the hull on the following day. I'll decide on whether to go to the effort of polishing the hull by hand after I've seen the results of the washing. Once this hull task has been completed I'll put up the rail netting along the foredeck. The hull work must be completed first because to do it I'll need to be able to grab onto the toe rail, which would not be possible with the netting up.
Anyway, I replied to Mark that I had decided to try to get by with what I had until I got to Australia. That night I checked the starter bank and it was down to 12V. True, they had not been charged for about 3 months since my departure for the USA because the solar panels and wind generator charge the house bank, but nevertheless it was another indication of their age. I decided then to try to do something about the problem. What had been putting me off were the lack of transport, knowledge of where to go, and worst of all, my language problem. Fortunately I had met Alexandre of Delta Yacht Charter only two days previously and decided to try seek his assistance. He manages a small fleet of charter boats which means that he is well plugged into the boat maintenance world, he is within easy reach at the end of the jetty, he is very helpful, and he speaks English!
Yesterday morning I visited Alexandre and started off by thanking him for arranging for young Luis to do the underwater hull work because he had done a great job. Then I asked him if he could help me with my battery problem. I specified two size 8D AGM (absorbed glass mat) 200 a/h batteries to match the physical size of the existing batteries. Alexandre replied that size 8D has no meaning to his battery people and I should provide him with the actual dimensions. He also told me that AGM batteries were not available (at least in his world) so we settled on maintenance free lead-acid. I got back with the battery measurements and post locations then he made a phone call and learned that matching my specifications would be difficult with the available made-in-Brazil batteries. He planned to drive to Angra next Thursday and suggested that he take me to the battery place where he would act as the interpreter. I happily agreed.
Back at the boat I thought about the battery size question and saw right away that I don't need a 400 a/h bank dedicated solely to starting the engine (Duh!). I drew a diagram of the battery box then returned to Alexandre's office. He was of the same opinion that 400 a/h was overkill and we agreed that two smaller 100 a/h batteries would be sufficient, which meant that the new batteries would comfortably fit into the box. On that basis I will be taking plenty of cash with me on Thursday in the expectation of purchasing two replacement batteries.
During the rest of the day I wiped most of the surfaces in the cabin with a weak solution of bleach in order to remove mold, then tied most of the diesel containers to the rails, and finished up by unpacking the Zodiac and inflating it in preparation for washing the above-water part of the hull on the following day. I'll decide on whether to go to the effort of polishing the hull by hand after I've seen the results of the washing. Once this hull task has been completed I'll put up the rail netting along the foredeck. The hull work must be completed first because to do it I'll need to be able to grab onto the toe rail, which would not be possible with the netting up.
Subscribe to:
Posts (Atom)