This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.

Pachuca

Pachuca
Pachuca in Port Angeles, WA USA

Sunday, January 25, 2015

New Inflatable Dinghy

A troll through the internet confirmed what I had learned the hard way about inflatable dinghies: It is the glue and not the material that fails over time.  The material can be easily patched but once the glue degenerates the dinghy is a write off.  I've got a Bombard and a Zodiac stored below my verandah for disposal to prove it.  The Bombard was in great shape when I departed on the circumnavigation in 2008.  In the six years of storage in cool, dry, protected environment of the garage the glue degenerated spontaneously.

Dry Run

Last week I purchased an Aristocraft "Bayrunner" inflatable with seams that are hot welded rather than glued.  Like most things, the dinghy is made in China, but I am putting my hopes in the PVC material that is sourced from Germany. 

The vaunted Hypalon material for inflatable dinghies is not amenable to thermo welding because it is rubber based.  Dupont must have seen the writing on the wall because it ceased production of Hypalon in 2012.  The future seems to be thermo welded PVC.

Because the instructions were execrable even by Chinese standards it took Brenda, Stephen, and myself a full 3 hours to assemble the dinghy.  After 2.5 hours I gave up and declared that Youtube was our only hope.  Sure enough we found videos on the Web that showed us the way.

The dinghy is heavy at 52 kg (114 lb) but the weight is distributed over two bags, one for the dinghy itself and one for the aluminum floor.   Installing the aluminum floor is a bit of an effort, but the result is superb and I am looking forward to our first ride in it. 

I wanted the 2.7m version, but they were sold out in the Perth area with no hope of one until March, which is much too late for the upcoming Bunbury Cruise.  So I asked for the 2.4m version (the same length as the Zodiac) but it too was sold out.  I had to settle for the 2.9m (9' 6") version, and the salesman knocked off $100 to make me feel better,  making the total cost $1250.

Wednesday, January 14, 2015

Gas Work Completed, Boarding Plank

The boat's gas system is now working and the new marine stove is operational.

I tested all of the couplings with a soapy water applied with a paint brush and after eliminating one small leak everything was safe.

Note in the photo how accessible are the gas cylinders and the manual selector switch above it.  The old system was set up terribly, with the cylinders hidden around the corner and the selector switch very hard to find, let alone reach and manipulate.
Gas Detector in Position
Cylinders and Selector Above Very Accessible

I then turned my attention to finding a way to make boarding of the boat from the jetty walkway easier and safer.  The problem is that the Fremantle Sailing Club has anachronistic fixed jetties which means that the boats are constantly dancing around their pens and worse, going up and down with the 1 meter tide.  When the tide is very low even I have trouble getting to the boat, much less passing supplies and equipment to it.  To date I have neither fallen into the water nor dropped anything, which I credit to focusing very hard when I am getting on and off the boat.

I've been nudged into action by my invitation to Bill and Pat, friends that I've met through Brenda, for drinks aboard Pachuca after I return from the Bunbury Cruise.  It is unfair to ask them, other guests, and Brenda to take that big step across the gap onto the moving boat.

I settled on the idea of setting up the boarding ladder as a part-time boarding plank.  The advantage of this is that I will not be burdened with yet another piece of large equipment that I must either carry on the boat or somehow hang from the jetty. To this end I have cut a piece of 18mm marine ply to fit along the length of the ladder.  The ladder will be fixed at the boat end and move at the jetty end.  I'll also rig a rope rail from the jetty post to the boat and drop the top rail on that side of the boat so that guests can step directly onto the boat.  If it works I'll name it either Bill's Bridge or Pat's Plank in honour of the guests who inspired me into action.
Proposed Boarding Plank

Yes, setting up the system for guests will be awkward, but if it work as planned I may be able to find faster ways of setting it up.

Friday, January 9, 2015

Gas System

The attempt to fire up the new marine stove has led to an upgrade of the boat's gas delivery system.  The stove was not getting gas and I tracked the problem to the cylinder selection switch which worked in one position but not the other.  Replacing that switch would require the extraction of the entire gas delivery assembly so I decided to take the opportunity to replace as much of it as possible.

Starting at the gas cylinders the components are as follows:
1. Hoses from cylinders to manual selector switch
2. The manual selector switch
3. The gas cutoff solenoid switch
4. The pressure reduction valve
5. The hose connecting to the copper gas line that supplies the galley

The first item was not critical since I had replaced those hoses in Hawaii about 4 years earlier.  However, I had to assume that the other items dated from 1983 when the boat was built.  I was particularly concerned with the last item, a fairly shabby looking flexible hose.

It took a bit of searching but my friends at Gas Components Australia at 1/4 Panama St, Canning Vale were able to replace everything but the solenoid switch.  I can live (literally) with that solenoid switch because the only consequence of it failing would be the shutting off of the supply of gas into the lines.
New System in Foreground

New Case

Case Ready for Varnishing

The photo tells the story, with the old items at the back and the new ones at the front.  The black rectangular component in the back is the solenoid switch, that will fit between the selector switch and the new 2-stage regulator.

The old setup was terrible, with the selector switch hidden at the back at a bad angle and difficult to see.  I decided to build a new cylinder case and put the selector switch on top of the case, where it will be easy to see and reach.  Besides, the old case is literally coming apart at the joins because it was too small to hold the larger cylinders that were introduced after I purchased the boat.

I then purchased two new gas cylinders because there is no hope of the existing cylinders meeting Australian standards.   I purchased them from Bunnings (sort of an Aussie Home Depot) knowing that I can exchange empty cylinders at any of their branches and any day of the week.  They are 3.7 kg in size, which should be ample for coastal cruising. 

I then purchased a nice piece of 18mm marine ply just large enough to do the job for $42.  I took great care in designing which surface would nail into which in order to maximize the strength against the tendency of the cylinders to break out of the box.  I joined the edges with Sikaflex construction adhesive (waterproof, paintable) held down with 40mm long galvanize nails.  The photo shows the new case with the new cylinders and the regulator assembly in its future position.  The holes at the sides will be for hooking "ocky" straps shown at the right.  The case will be screwed into the lazarette floor.

The final photo shows the case ready for varnishing.  I decided to treat the wood with several coats of Danish oil because it will penetrate the wood.  Neither sunlight nor aesthetic beauty will be issues, given that the case will be hidden to one side of the lazarette.

The gas supply system represents probably the last dark and mysterious corner of Pachuca because over the years I have been forced to deal with just about every other aspect of the boat.  I departed on the circumnavigation in 2008 knowing that I had not checked out the gas system and hoping for the best, placing great reliance on the gas detection and cutoff safety system.  Fortunately I made it back to Fremantle safely with no line ruptures or regulator failure

Friday, December 26, 2014

New Surfaces

The plan that young Paul and I formulated last September to place stainless steel counter surfaces in the galley and head has progressed nicely.

The sheet metal worker produced the surfaces for only about $300.  As I was paying him I told him that I was getting a bargain and he agreed.  I told him that from now on I would see him for any stainless steel or aluminum work for the boat.  I then pass on the observation to Paul that the further from the coast one gets the cheaper the boat work.

Paul and I spent close to two days fitting the pieces.  He cut out the openings for the refrigerator and ice box openings, which was tricky operation because the metal would have to hug the thin wooden lips of the openings.  By then I had new taps: two ordinary kitchen taps for pressure water, and three good quality hand pumps.  There will be fresh and salt water hand pumps in the galley and a fresh water hand pump in the head.
Fresh Water Left, Salt Water Right

New Stove in Position

I had decided to keep the old sinks, which I had taken home and brightened up using a buffing wheel on my angle grinder.  We installed the sinks then it was left to me to install the taps on my time.  Installing the sink before the taps turned out to be a mistake because I found it impossible to install the taps working up that narrow space between the sink and the bulkhead.  I was forced to remove the galley sink, and the sooner the better before the Sikaflex 291 adhesive set hard.  That turned out to be a difficult job because any undue pressure would result in bending the lip around the sink.  I did the job by gently tapping a paint scraper along the lip of the sink then using gentle pressure.

After installing the taps I re bedded the sink using silicone sealant, which is gentler than 291, because I want to be able to remove the sink for future work on the taps.


I then turned my attention to the marine stove.  The connection was simple but the stove would not light.  I found that the cylinder was empty so switched to the spare.  Then I discovered that the manual gas valve at the galley was shut, but still the stove would not light.  I could hear the solenoid clacking as normal which allowed the gas to flow, so I uncoupled the gas hose at the stove end and confirmed that no gas was flowing.
Sink in Head
I eventually tracked the problem to the cylinder selector valve, which worked in one position but not the other.  It was a relief to know that the stove, the main gas line, and the gas cutoff solenoid were OK.  It was time that I gave that gas setup in the transom some attention - some hoses were looking a bit tatty, the pressure regulator was old when I purchased the boat, and too many things were welded together by corrosion - so I removed the regulator-solenoid-selector valve assembly and will visit the gas supply shop to try to get replacements for those items and three hoses.
Hoses and Pressure Components to be Replaced

I am enclosing photos of the galley, with the new stove, surfaces, and taps.  Paul has the lids at his place for fitting of their stainless steel surfaces.  There is also a photo of the gas components to be replaced.

Saturday, September 6, 2014

Maintenance on Hard Stand

On Friday the 5th of September we put Pachuca back in the water after two hard weeks of hull maintenance.

When I sailed into Fremantle from Cape Town in April 2013 the boat had not been antifouled since Mexico in 2011.  I had her hull cleaned by divers in Argentina, Brazil, and Cape Town and Neil Huck commented on how surprisingly clean the hull looked when I arrived.  Unfortunately I was forced to neglect the boat for another sixteen months while I attended to the reestablishing myself in Perth and the renovation of the house.
Old Stove Before Removal

Being Removed

Burners Rusted Out

Stove Site Prepared

Good Fit

The boat had been out of the water for over two months on an exchange of three months of free hard standing for the use of my pen for boats visiting for the winter series of sailing.  I expected the maintenance effort to take about a week but the work took two weeks thanks to invaluable assistance from Paul Bylinski Jr in helping me in the installation of the new marine stove, which I had expected to do after the boat was back in the pen.

The hull below the water line needed sanding back to the gel coat when I purchased the boat in 2005, and now it needs it more than ever.  However, dry sanding is no longer allowed in the FSC hardstand area and I was not equipped for wet sanding.  I did the best that I could with scraping the loose flakes by hand, followed by wet sanding by hand using a metal mat.  I then rolled a barrier coat (Hempel "Hempatex" Aluminium 16300) to separate the USA style hard antifouling to the Australia style self oblating (soft) antifouling.  After that I rolled on two coats of blue Hempel Olympic 86901 antifouling, with three coats in the high load areas of the hull.  Unless I have the boat professionally painted next year (more on that below) I'll begin next year's hull maintenance prepared with a compressor and pneumatic equipment that will allow me to do a proper sanding job on the hull.  In the meantime it doesn't really matter since I'm not racing the boat and the roughness of the hull cannot be seen through the water.

I did a nice job of cleaning the propeller and shaft, then laid down a coat of metal primer from Pesle Marine Paints followed by two coats of Velox Plus.  These are products from Italy that are deemed to protect the propeller for at least two years.  They are not cheap at over $200 but well worth the price if it obviates the need for me to go over the side in cold waters to clean the growth from the propeller.  Besides, there is enough material remaining in the cans to last me several years.

I got my paint and antifouling advice and materials from Gary Martin, whom I have been dealing with for years and has always been a wealth of information.  (He also did a 2-year term as the Commodore of the FSC while I was away.)

Feeling Blue After Hard Day



Barrier Coat On

Clean Propeller, Shaft, Dynaplate

Rear Anode Not Yet in Place
I had the extreme good fortune of having Paul Jr take an interest in Pachuca.  Paul is a trained carpenter and in his renovation work showed himself to be a skilled all-arounder.  He spent several hours helping me fit in the new marine stove then returned for a full 12 hour session to pretty well complete that and other jobs.  I mentioned to him that I planned to find someone to fit new counter tops in the galley and head because it was beyond my competence and soon he had a plan of doing it all in stainless steel.  He made cardboard patterns of the surfaces, took photos and measurements, and will have a metal worker that he knows fabricate the stainless steel sheets, with turned up fiddles (edges).  Paul will cut the openings for the sinks and water taps.

I expect to take Paul out on the boat as often as he wants and teach him sailing.  And if he really, really likes sailing he would be a great partner to help me sail the Pachuca further afield such as the Houtman Abrolhos Islands (http://en.wikipedia.org/wiki/Houtman_Abrolhos), which Brenda and I visited in about 2003 when we delivered that rust bucket Boro 34 sloop Jennica from Geraldton to Hillary's Boat Harbour. 

I got extremely good advice from Gary on the issues in having Pachuca professionally painted.  The sanding and painting must be done in a shed, which means that the mast must be removed.  If the mast must be removed then I may as well have it sanded and painted too (also in a shed).  As long as the hull will be prepared for a shed I may as well also have its hull below the water line blasted to the gel coat in the special shed.  I would prepare the boat by removing as much equipment and fittings as practical from the deck and cockpit.

The entire painting process would take about 4 weeks, with December and January being the best times due to the dry weather.  The ballpark figure of the costs are $20k for the deck and hull painting, $3k for the hull blasting, and I figure another $2k for the mast.  I'll have to go in preparing to spend $30k total.  That's a lot of money, but I spent $25k on an engine that cannot be seen, not to mention the more than $10k for rigging in over priced Argentina. The new paint job would be very visible and turn this classic S&S 39 into a head turner.

I used the word "would" because I'm not sure what I'll do.  It would not be a money thing, since a CUOF like me can afford the indulgence of such follies.  On the other hand, she still presents fairly well and I want to sail Pachuca without fear of putting a scratch on her precious hull. 

Anyway, Pachuca's back in the water now and I can rest for a few days after that those hard 10-12 hour days.

Thursday, August 21, 2014

Boat Work Begins

After neglecting Pachuca for over two months that she's been on the hard stand I am finally able to turn my attention to her.  I expect to work on her for about 7 days and have her back in her pen at the end of this month. 

Yesterday morning I packed the car with all of the tools that I thought might useful for the maintenance and drove to Brenda's house for the duration of the boat work.  Brenda's house is a 5 minute drive from the Fremantle Sailing Club and provides an ideal base of operations.  And I must say that I enjoy the company of Brenda, Stephen, and Shelley the Dog. 

I arrived at the boat at about 1 PM today with the goal of removing the old marine stove.  I was able to accomplish this in about an hour and devoted the next few hours to thoroughly cleaning out the stove space then cleaning out the bilge.  With the stove removed I will be able to paint the recess for the first time, and I'll want to do a good job because it will be the only chance that I get.

The brand of the stove had always been a mystery to me because no documentation was provided when I purchased the boat.  However, the mystery was solved when I was able to read the plaque at the back which informed me that it was an SMEV Series 7000 made in Italy in December 1995.  It had been distributed by Camec Pty Ltd of Clayton, Victoria. 

I expect to see Paul Jr at 7.30 tomorrow morning.  He will help me lift the new stove up the steep ladder into Pachuca's cabin, then I'll give him a tour of the boat.  After that we'll discuss the fitting of the new stove.  Paul's skills are primarily in carpentry rather than metal work, but he might be able to suggest some solutions.
Before Removal

Badly Corroded Burners
Removed

Friday, August 1, 2014

Member of IACH

I have been privileged to be accepted as a member of the International Association of Cape Horners (http://www.capehorners.org/).  The basic requirements for ful membership are:

1. Rounded Cape Horn under Sail
2. Have "doubled the Horn" (ie Lat 50S to Lat 50S non-stop)
3. As part of a non-stop voyage of at least 3000 nautical miles.

There are about 350 names in the membership list, and my membership number is 769.  Looking through that list I saw that most of the members reside in UK and made their rounding of the Horn as part of one of the great ocean races (e.g. Whitbread, Global Challenge, BT Challenge).  The names of luminaries such as Sir Chay Blyth and Sir Robin Knox-Johnston jumped out of the list, but I could not find the name of the incomparable Jon Sanders. 

I will receive the IACH journal twice a year ("The journal is a wonderful source of seafaring and yachting material, all supplied by members.") and have been invited to submit any stories and anecdotes that might be of interest to others.

Blog Archive

Contributors

Statistics Click Me