Result of Bruce's filling and sanding corroded areas |
Bruce and Steve installing the mast steps |
We unloaded the pieces next to the boat and at about 10.30 Steve the rigger from Boating Hardware began the task of reassembling the mast with the assistance of Bruce.
The work went well and by the end of the day all of the mast steps (which had been powder coated) had been pop riveted on (four stainless steel pop rivets per step) and work had begun on the other mast fittings. During the day I had visited Yacht Grot and purchased a new combination steaming and deck light.
I spent my day finishing the removal of the silicone sealant from around the cabin window openings then sanding the remaining parts of the bilge to be repainted.
We expect to receive the new windows and repaired water tank within the next two day.
No comments:
Post a Comment