This blog began in late 2006 with the planning and preparation for a circumnavigation of the world in my 39-foot sail boat Pachuca. It then covered a successful 5-year circumnavigation that ended in April 2013. The blog now covers life with Pachuca back home in Australia.

Pachuca

Pachuca
Pachuca in Port Angeles, WA USA

Thursday, September 18, 2008

Score Board

The following is the final version of our New Zealand task list:

Task No. TASK Start Date Completed Date
1 Replace masthead wind instruments 10/08/08 22/08/08
2 Fix compass light 11/08/08 12/08/08
3 Solve battery problems 09/08/08 12/09/08
4 Repair engine-starting switch 09/08/08 17/09/08
5 Replace battery tester ammeter 09/08/08 12/09/08
6 Repair Anchor Winch 09/08/08 27/08/08
7 Engine service 09/08/08 12/09/08
8 Replacement alternator belt 09/08/08 12/08/08
9 Repair wind charger 11/08/08 10/08/08
10 Replace/Repair Fwd Hatch 11/08/08 22/08/08
11 Repair loose railing 10/08/08 27/08/08
12 Replace roller furler line 11/08/08 12/08/08
13 Cockpit jack lines 27/08/08 27/08/08
14 New mainsail sheet 11/08/08 12/08/08
15 Replace life jacket cartridge, spares 10/08/08 27/08/08
16 Repair starboard bow fair lead 09/08/08 10/08/08
17 LED globes for cabin lights 09/08/08 26/08/08
18 Repair/replace Rutland Wind Charger 11/08/08 09/08/08
19 New barge boards
20 More snaps for main dodger 08/09/08 15/09/08
21 Repair starboard rail dodger 26/08/08 26/08/08
22 Lee cloth for Arnold's bunk 26/08/08 27/08/08
23 Hang V-Berth curtain 04/09/08 04/09/08
24 Investigate anchor well for leaks 11/09/08 12/09/08
25 Soap dispenser shock cloth in head
26 Install Cabin Fan
27 GPS antenna for Arnold's laptop 14/08/08 23/06/08
28 Install JVComm32on Arnold's laptop 08/08/08 13/08/08
29 Purchase 406 Mhz EPIRB 11/08/08 26/08/08
30 Replace Traveler Lines 12/08/08 13/08/08
31 Seal cockpit coaming dorade vents 14/08/08 14/08/08
32 Install larger midships bollards 14/08/08 24/08/08
33 Install 2 more midships bollards 24/08/08 25/08/08
34 Repair/replace anchor winch foot switch 11/09/08 11/09/08

We decided to wait until we get to Seattle to produce two well-designed and varnished barge boards for the boat. In the meantime we will sail with the two boards that we received in Eden. The soap dispenser and cabin fan installations are trivial and I will do them at sea. Otherwise I am happy to report that all of the big items have been done.

No comments:

Blog Archive

Contributors

Statistics Click Me